![Hyundai DHY6000SE Service Manual Download Page 26](http://html.mh-extra.com/html/hyundai/dhy6000se/dhy6000se_service-manual_2196547026.webp)
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
Changzhou ITC Power Equipment Manufacturing Co.,Ltd.
23
POWER PRODUCTS
3.2.12 Cylinder head cover
Install with a new gasket
3.2.13 Fuel injector
(1) Install the fuel injector assembly.
(2) Tighten the lock bolts.
(3) Install the high-pressure fuel line.
·Be sure the installation direction of fuel injector is correct.
·Replace the nozzle washer when reassembling.
Injector Tightening Torque
10-12 N.m
3.2.14 Air inlet pipe
Install the air inlet pipe and ensure the washer is in proper position.
3.2.15 Cooling fan case
(1). Install the starter reel.
(2). Install the cooling fan case.
·Apply the seal rubber to the case.
·Be sure the collar and the fan case supporting are in right position.