Installation
User Manual
34
3. Lay out the cable according to design requirements and fix the cable with cable ties.
4. Attach labels or tags to the installed cable.
4.5
Post-installation Check
4.5.1
Checking the Installation
Check the cables according to the table below.
No.
Item
1
The device is installed by strictly following the design draft. The installing position meets space
requirements with maintenance space reserved.
2
The device is securely installed.
3
Waterproof caps are installed on idle connectors and securely fastened.
4
All power cables or grounding cables are not short-circuited or reversely connected and must be
intact with no damage.
5
The power cables and grounding cables are separated from other cables and bundled separately.
6
Connectors of all cables are complete, intact, and tightly connected. The cables are not damaged
or broken.
7
Labels on cables, feeders and jumpers are clear and correct.
4.5.2
Checking the Device with Power On
After the installation is complete, observe indicators on DS-9300 device to determine the system running
status.