Horn
REPLACE
1.
Move the truck to a safe, level location; turn the
key switch to the OFF position; and disconnect
the battery. Block the drive tire to prevent un-
expected movement.
2.
Remove the drive unit compartment covers. See
General in this section.
3.
Discharge the capacitor. See Discharging the
4.
Disconnect the horn wiring from the main wir-
ing harness.
CAUTION
DO NOT overtighten horn mounting hardware.
5.
Remove nuts and washers from bolts securing
horn to frame. Remove horn from bolts. Posi-
tion new horn onto bolts as removed and install
washers and nut.
6.
Install wiring to horn as removed.
7.
Connect the battery, turn the key switch to the
ON position, and test for proper operation.
Turn the key switch back to the OFF position
and disconnect the battery again to finish re-
pairs.
8.
Install the drive unit compartment covers as re-
moved. See General in this section. Return the
lift truck to service.
High Speed Switch Assembly
The high speed switch is mounted to the floor of the
operator's compartment. The operator depresses
the switch using the right foot to increase the
travel speed of the truck. Proper operation of the
high speed switch increases productivity by reduc-
ing travel times. The high speed switch assembly
must be disassembled to install. Perform only the
removal steps necessary to repair switch and in-
stall. Refer to Figure 14 for the following proce-
dures.
REMOVE
1.
Move the truck to a level area. Turn the key
switch to the OFF position and disconnect the
battery.
2.
Remove the floor mat to access the switch.
3.
Remove the two screws (2) and lockwashers (3)
from the side of the switch to release the top
cover.
4.
Remove the two screws (17) and lockwashers
(18) attaching the base to the frame.
5.
Remove the two screws securing the actuator
and actuator plate and switch to the base.
6.
Remove actuator from actuator plate.
7.
Tag and identify wires to the switch. Remove
the screws (6) and lockwashers (7) attaching
the wiring harness to the switch.
2200 SRM 1632
Horn
17