POST-INSTALLATION
HySpeed HT2000
Instruction Manual
5-7
19
If the system does not function as outlined in this procedure, recheck the pre-installation requirements and
installation directions in this manual. If all pre-installation and installation directives have been followed and
you are still experiencing difficulty with the system, feel free to call Hypertherm's Field Service group at
1-800-643-9878.
Figure 5-2
Torch with inductive probes
Leads to RHF Console
and Motor Valve
Console
(Off valve not shown)
Probes
Torch sleeve
Torch mounting
bracket
Securing screw
Summary of Contents for HT2000
Page 1: ...200 Volt Plasma Arc Cutting System Instruction Manual 802460 Revision 14 HySpeed HT2000 ...
Page 9: ......
Page 95: ...POST INSTALLATION 5 8 HySpeed HT2000 Instruction Manual 19 ...
Page 175: ...MAINTENANCE 8 30 HySpeed HT2000 Instruction Manual 22 ...
Page 235: ......
Page 236: ......
Page 237: ......
Page 238: ......
Page 239: ......
Page 240: ......
Page 241: ......
Page 242: ......
Page 243: ......
Page 244: ......
Page 245: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 257: ......
Page 259: ......
Page 261: ......
Page 262: ...Coolant Flow Diagram ...
Page 263: ......
Page 265: ...APPENDIX A a 2 HySpeed HT2000 Instruction Manual 20 ...
Page 267: ...b 2 HySpeed HT2000 Instruction Manual 19 ...
Page 268: ...HySpeed HT2000 Instruction Manual b 3 19 ...
Page 269: ...b 4 HySpeed HT2000 Instruction Manual 19 ...
Page 270: ...HySpeed HT2000 Instruction Manual b 5 19 ...
Page 272: ...HySpeed HT2000 Instruction Manual b 7 19 ...
Page 273: ...b 8 HySpeed HT2000 Instruction Manual 19 ...
Page 274: ...HySpeed HT2000 Instruction Manual b 9 19 ...
Page 275: ...b 10 HySpeed HT2000 Instruction Manual 19 ...
Page 279: ...APPENDIX D d 2 HySpeed HT2000 Instruction Manual 19 ...
Page 285: ...APPENDIX E e 6 HySpeed HT2000 Instruction Manual 19 ...