Preventive maintenance
4
110
811390
Operator Manual
DynaMAX 550P/560P/575P Waterjet Pump
1.
Examine the seal housing and the high-pressure seal backup. Make sure that the weep holes
and the inner grooves are clean.
2.
Put O-ring lubricant on the backup ring and the seal housing O-ring.
3.
Put the seal housing O-ring backup and the seal housing O-ring on the seal housing. Put the
O-ring on the side nearer the narrow end of the seal housing.
4.
Put the plunger bearing on the plunger. Push the plunger bearing into the hydraulic end cap.
1
2
1
Weep holes
2
Grooves
1
2
1
O-ring backup, -035
2
Seal housing O-ring, -035
The seal housing O-ring backup has a flat side and a concave side. Make sure the
flat side of the O-ring backup faces the wide end of the seal housing. The O-ring fits
into the concave groove on the O-ring backup.
1
2
Summary of Contents for DynaMAX 550P
Page 1: ...DynaMAX 550P 560P 575P Waterjet Pump Operator Manual 811390 REVISION 0 ENGLISH...
Page 16: ...Product stewardship 16 811390 Operator Manual DynaMAX 550P 560P 575P Waterjet Pump...
Page 46: ...Optional equipment 2 46 811390 Operator Manual DynaMAX 550P 560P 575P Waterjet Pump...
Page 64: ...Operation 3 64 811390 Operator Manual DynaMAX550P 560P 575P Waterjet Pump...
Page 136: ...Preventive maintenance 4 136 811390 Operator Manual DynaMAX 550P 560P 575P Waterjet Pump...
Page 146: ...Parts lists 5 146 811390 Operator Manual DynaMAX 550P 560P 575P Waterjet Pump...
Page 172: ...Troubleshooting 6 172 811390 Operator Manual DynaMAX 550P 560P 575P Waterjet Pump...
Page 222: ...Technical drawings 10 222 811390 Operator Manual DynaMAX 550P 560P 575P Waterjet Pump...
Page 223: ...Technical drawings 10 DynaMAX 550P 560P 575P Waterjet Pump Operator Manual 811390 223...