background image

Notice: when necessary according to the instructions, stabilisers 

and ballast have to be used. 

At  windspeeds  of  12m/s  and  more,  the  stability  is  not  being 

guaranteed. Extra windload should be taken in account (tunnelwinds 

in open structures, corners at buildings). In these cases the tower 

should be dismantled or moved into  a safe zone,  or secured  otherwise. 

4. Stability 

- Before  use,  check  if  the  tower  has  been  erected  correctly  and

completely and check safety equipment.

- Apply brakes (red pedal in down position) (if attached).

- Mobile aluminium towers should be moved lengthwise and at normal

walking speed.

- Avoid contact with other objects.

- The mobile aluminium tower may only be used when all precautionary

guardrails and toeboards are in place, according to the manufacturers

instructions.

- Trapdoors should be closed, except when in direct use.

- Be aware of horizontal and vertical loads which may lead to tipping

over of the aluminium tower e.g.:

- horizontal  loads  (working  on  other  structures,  push  off

effect of heavy equipment, ...)

- extra windloads, like windtunneleffect in open structures,

corners at buildings

- Tools  and  materials  should  be  passed  on  from  below.  Do  not

overload platform.

- Check the functioning of stabilisers (if attached) before using the

aluminium tower.

- Do check national and local legislation before every use.

5. Safety notice

- All parts of the aluminium tower should be handled carefully when

transported to avoid damage.

- Store all parts correctly and safely to avoid damage.

- Protect all parts against weathering.

- Check all moving parts on their functioning and on being clean.

- Check all parts on damages.

- Replace damaged parts.

© Hymer-Leichtmetallbau

The contents of these instructions in any form (e.g. written or

electronically)  may  under  no  circumstance  being  copied,

passed on or published without written permission of Hymer-

Leichtmetallbau.

(Under reserve of errors and technical changes)

6. Maintenance and checks

- Only one platform may be loaded at a time.

- Work may only be carried out on one platform at a time.

- More than one person may stand on the platform, provided the  

maximum total load is not exceeded.

2017-02  0095581  70094

10

Summary of Contents for 70094

Page 1: ...odular Instrucciones de montaje y uso ES Modulov le en N vod na mont a pou it CS RO Schel modul Instruc iuni de montaj i utilizare Modul llv ny sszeszerel si s haszn lati utas t s HU Andaime modular I...

Page 2: ...min 2 Hymer Leichtmetallbau GmbH Co KG K ferhofen 10 88239 Wangen GERMANY Tel 49 0 75 22 700 700 Fax 49 0 75 22 700 179 info hymer alu de www hymer alu de 2017 02 0095581 70094 2...

Page 3: ...4 76 2 70094 22 70894 24 70094 25 70894 27 70894 28 7072 26 6177 50 0095581 7072 41 70094 23 Einzelelemente St ckliste partlist Pi ces d tach es especificaci n onderdelen stuklijst 70094 03 70094 15 7...

Page 4: ...4 03 70094 05 70094 07 H m 3 00 5 00 7 00 m 2 15 4 15 6 15 h m 0 95 2 95 4 95 4 4 3 3 2 1a 1b 1c 1b 1a 70894 27 70894 28 70094 36 70094 22 7072 49 7072 49 70094 22 70894 28 70894 27 max 1 00m 70894 24...

Page 5: ...0094 22 70894 28 70894 24 70094 22 70894 27 70094 22 D C B A 2 70894 27 70894 28 1c 70894 27 0 5m 1 0m 70094 23 70094 23 7072 49 007760 4 007760 007760 007760 007760 007760 E E 6 D Stopp 6177 50 2017...

Page 6: ...094 05 70094 07 4 12 4 12 7072 41 Nr kg 70094 03 70094 05 70094 07 7072 41 0 6 1 2 004124 10 0 1 5 kN 004124 0 8x H 70094 03 70094 05 70094 07 Nr kg 70094 03 70094 05 70094 07 7072 41 0 6 1 1 2 004124...

Page 7: ...und Abbau werden mindestens 2 Personen ben tigt Es ist zu berpr fen ob alle Teile Hilfswerkzeuge und Sicherheits vorrichtungen f r die Errichtung der Fahrbaren Arbeitsb hne auf der Baustelle zur Verf...

Page 8: ...er Eck Schritttempo verfahren Jeglichen Aufprall auf Hindernisse vermeiden Fahrbare Arbeitsb hne nur verwenden wenn die genutzten Belag fl chen allseitig mit Seitenschutz nach Herstellerangabe versehe...

Page 9: ...persons familiar with these instructions are allowed to erect dismantle and use the aluminium tower For erecting and dismantling at least 2 persons are needed Before erecting the aluminium tower ensu...

Page 10: ...er structures push off effect of heavy equipment extra windloads like windtunneleffect in open structures corners at buildings Tools and materials should be passed on from below Do not overload platfo...

Page 11: ...t inform es des modalit s de montage et d montage sont autoris es mon ter et d monter les chafaudages roulants Pour le montage ou le d montage 2 personnes minimum sont n cessaires V rifier si la total...

Page 12: ...il sur les limites de constructions charges provoqu es en cas de vents effet de tourbillon de tunnel entre les immeubles immeubles en construction non ferm s et angles d immeubles D placer les outils...

Page 13: ...mogen de rolsteiger opbouwen en gebruiken Voor op en afbouw zijn tenminste 2 personen nodig Controleer of alle onderdelen gereedschappen en veiligheidsvoor zieningen voor de opbouw van de rolsteiger...

Page 14: ...den aan constructies afdrukeffect van boormachines extra windbelasting tunneleffekt in open gebouwen en hoeken van gebouwen Gereedschappen en materialen van onder naar boven binnen de basis van de ste...

Page 15: ...usar el andamio Para el montaje y desmontaje son necesarias por lo menos 2 personas Es necesario revisar que todos las piezas herramientas como elementos de seguridad esten a disposici n antes del mon...

Page 16: ...izontales por trabajos en construcci nes colidantes cargas de vientos adicionales efecto tunel en edificios de paso edificios sin rematar o en esquinas de edificios Transpasar herramientas o materiale...

Page 17: ...Para a montagem e desvantagem s o necess rias no m nimo duas pessoas Verifique se todas as pe as ferramentas auxiliares e dispositivos de seguran a necess rios para montar o andaime m vel s o dispon v...

Page 18: ...horizontais devido a trabalhos executados em constru es pr ximas cargas originadas pelo vento efeito t nel de edif cios de passagem edif cios sem revestimento e esquinas de edi f cios quando os operad...

Page 19: ...dn le en montovat a pou vat Pro mont a demont jsou potr bn dv osoby Nutno zkontrolovat zda jsou na m st v echny d ly le en vhodn n ad a bezpe nostn za zen P ed mont je nutn zkontrolovat n sleduj c poj...

Page 20: ...kter by vedly k prevr cen vodorovn pret zen napr pr ce na prilehl ch konstrukc ch siln v tr tunelov efekt mezi budovami rohy budov n rad a material pod vat vzdy zespod nahoru Nepretezovat podlahu pred...

Page 21: ...montovat a pouz vat Mont z a demont z musia prev dzat minim lne dve osoby Je nutn skontrolovat v etky diely le enia potrebn n radie a bezpecnostn zariadenia Pred mont zou je tiez nutn skontrolovat n...

Page 22: ...ovn zat azenie ktor by mohlo zapr cinit prevr tenie siln vietor tunelov efekt medzi budovami rohy budov n radie n cinie a materi l pod vat vzdy zo spodu nepret azovat podlahu pred kazd m pouzit m v lo...

Page 23: ...odrov Za monta o in demonta o sta potrebni najmanj 2 osebi Potrebno je preveriti ali so na gradbi u na voljo vsi deli pomo na orodja in varnostna oprema za postavitev premi nega delovnega odra Pred p...

Page 24: ...u inkovitost varovalke Preverite u inkovitost zavore kolesc rde i pedal v spodnjem polo aju kadar so na voljo Premi ni delovni prestaviljate v skladu z mo nostmi samo po dol ini ali ez vogal hitrost...

Page 25: ...tuire i de aceea ele sunt cuprinse deja n lista specificativ i n reprezentarea schematic pentru montaj ATEN IE Montarea i utilizarea acestei platforme de Iucru mobile este permis numai persoanelor car...

Page 26: ...i cu alte dispozitive de construc ie n afara momentelor n care este necesar trecerea prin ele clapete le de trecere trebuie fie ntotdeauna nchise Avertiz m n privin a sarcinilor orizontale i verticale...

Page 27: ...n lhatj k akik j l ismerik annak sszeszerel si s haszn lati tmutat j t Az sszeszerel shez s lebont shoz legal bb 2 ember sz ks ges Ellenorizni kell hogy a mozgathat llv ny sszeszerel s hez sz ks ges r...

Page 28: ...t rt no tk z st A mozgathat llv nyokat csak akkor haszn ljuk ha az alkalmazott h dl sok minden oldalr l a gy rt elo r sainak megfeleloen v dve vannak A mozgathat llv nyokat se egym ssal se m s p toip...

Reviews: