
22
STARTUP INSTRUCTIONS
1. Connect the Transformer to the Valve
Plug the 12-volt transformer into a 120 VAC 60 Hz outlet.
2. Add Water to Brine Tank
Open the brine tank /cabinet salt lid and add
water as per the chart below. Do not add salt to
the brine tank at this time.
BT-100 -2.5 US Gallons
BT-145 - 3.25 US Gallons
BT-200 - 5.5 US Gallons
Familiarize with Button Configuration:
3. Screen Display
MENU
SET
MENU
SET
MENU
SET
Key Pad Configuration
MENU
This function is to enter the basic set up information required at the
time of installation.
SET
This function is to initiate an immediate or delayed manual
regeneration.
DOWN /
Increase or decrease the value of the settings while in the
UP
programming mode.
MENU
SET
Date and Time
18-Apr-2018 10:35AM
Gal Remain 1400
Flow Rate 3 gpm/min
The controller will show the following on the
screen - Time, Date and Gallons Remaining
for Regeneratio
n
4. Manually Regenerate the Valve
Manually step the valve to the BACKWASH position. If screen is locked, press
MENU
Key for 5 seconds to unlock.
Manually Regenerate the Valve and move it to backwash position.
Sample
Connection
Sample
Connection
SERVICE
BYPASS
Sample
Connection
Sample
Connection
SERVICE
BYPASS
MANUAL REGEN
Delay
Immediate
BACKWASH
IIIIIIIIIIIIIIIIIIIIIIII 15 Minutes
BRINE DRAW
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 50 Minutes
BACKWASH
BRINE DRAW
RINSE (SKIP)
REFILL (SKIP)
Summary of Contents for 89DF Series
Page 2: ......
Page 50: ......
Page 51: ......
Page 52: ...54577 11 18 TOLL FREE 1 877 288 9888 Regina SK Cambridge ON Carmel IN Pottstown PA Phoenix AZ...