
20
STEP 9: INSTALL THE CROSS CHANNEL ASSIST (25,000 ONLY)
1.
Slide the Cross Channel Assist between the AUX tank I
-
Beam and the Hull Pad Bracket.
•
The Cross Channel Assist will only be installed on the five aft cross channels.
•
The Cross Channel Assist should be positioned
1”
away from the cross channel to leave room for the U
-
Bolt. It will extend
1”
past the hull pad.
2.
The U
-
Bolt will slide over the Cross Channel assist into the AUX tank I
-
Beam. Drill two holes in the I
-
Beam to align
with the U
-
Bolts.
3.
Run the U
-
Bolt over the Cross Channel Assist into the AUX tank I
-
Beam and loosely fasten it with the brass nut.
4.
Repeat these steps for each Cross Channel Assist.
5.
After confirming the alignment, tighten the U
-
Bolts.
Hull Pad Bracket
Cross Channel Assist
AUX Tank I
-
Beam
A
1”
gap is required between cross beams
Cross Channel
Part #
Parts Required
Quantity
HH
-
4348
CROSS CHANNEL
-
3IN. SQ. V CEN-
TER AUX ASSIST
5
Part #
Hardware Required Per Beam
Quantity
HH
-
LPL
-
1504
U
-
BOLT .375 x 3 x 6 SS
2
HH
-
2603
NUT 3/8"
-
16 BRASS
4
HH
-
LPL
-
1505
LOCK WASHER 3/8"
-
16 SS
4
HH
-
2607
WASHER
-
FLT 3/8" SS
4