16
1.
Place the Receiver Spacers, two per tank, on the rear bolts that are pointing up. Be sure to place them on
the opposite tank that you are connecting.
2.
Connect the facing tanks by placing the Cross Channels on top of the Support Channels between the U
-
Bolts. Install the Top Clamp to the tank frame assemblies.
3.
Finger
-
tighten the U
-
Bolt nuts to hold the Top Clamp in place. Repeat for each set of tanks.
Do not fully tighten until you verify that Step 6(a), 6(b), and 6(c) have been completed.
STEP 6(c): INSTALL TANK CROSS BEAM ASSEMBLY
Part #
Parts Required (Per Tank)
Quantity
HH
-
7101
TOP CLAMP—RECEIVER HH
2
HH
-
3404
CROSS CHANNEL
-
3IN. SQ. 104IN. LONG
ALUMINUM
2
Support Channel
Top Clamp
Receiver Spacer
1/2”
Brass Hex Nut Nyloc and 1/2 F
3/8
-
16 Brass Hex Nut
3/8”
SS Flat Washer
3/8”
SS Lock Washer
3”
SQ Cross Channel
Part #
Hardware Required (Per Tank)
Quantity
HH
-
1975
BRASS HEX NUT 3/8
-
16
12
2090242
FLAT WASHER
3/8”
SS
12
HH
-
LPL
-
1505
LOCK WASHER 3/8
-
16 SS
12
HHE
-
7107
REAR PVC SPACER
2
HH
-
LPL
-
1508
WASHER
-
FLAT
-
1/2" x 2 OC SS
6
HH
-
2100
NUT 1/2
-
13 BRASS NYLOC
4
THE CROSS CHANNEL ENDS SHOULD NOT BE VISIBLE THROUGH THE SIGHT HOLE ON THE TOP CLAMP.
IF THE END OF THE CHANNEL IS VISIBLE, THIS COULD REDUCE THE STRUCTURE LOAD CAPABILITIES OF
THE FRAME ASSEMBLY.
Sight Hole