
14
3.
Perform Steps 6(b) and (c). Verify equal length diagonals as you build from tank Set 1 to tank
Set 5 as shown below to ensure they are square.
4.
After confirming the lift is square and all assembly for Steps 6(b) and (c) are completed, tighten all
hardware completely.
Set 1
Set 2
Set 1
Set 2
Set 3
Set 1
Set 2
Set 3
Set 4
Set 1
Set 2
Set 3
Set 4
Set 5