7 | Operation
HYDAC FILTER SYSTEMS GMBH
58 / 92
BeWa FCU1210 3545830b en-us lq
3.
Connect the entry hose (color: black) with the INLET
connection of the FCU (1).
Rotate the measurement coupling clockwise (2) to the
connection and tighten it by hand.
4.
Connect the other end of the INLET pressure hose to
the measurement point of the system.
5.
Switch on the internal pump.
ð
The hydraulic installation of the FCU is complete.
The FCU will start with the measurement.