![Hyd-Mech S-20H Operations & Maintenance Manua Download Page 26](http://html.mh-extra.com/html/hyd-mech/s-20h/s-20h_operations-and-maintenance-manua_2191202026.webp)
Pg 15
S22Hna 2002a
MAINTENANCE
AND
TROUBLE SHOOTING
LOCK -OUT
Purpose:
To prevent injury to workers caused by unexpected start-up of machines being worked on.
OR
Where the starting of a machine or device may endanger the safety of a worker.
a) Control switches or other control mechanisms shall be locked out;
AND
b) Other effective precautions necessary to prevent such starting shall be taken.
LOCK OUT PROCEDURE
Whenever work is to be performed on a machine, the following steps shall be taken:
1. Operator shuts down the machine
2. The person in charge should follow Lockout procedures as is required by his organization.
Switch off before beginning work.
·
The emergency switch, which is used to turn the hydraulics off, should not be the
only means of shutting the power off before cleaning or performing maintenance to the
machine. The main power disconnect should be switched off and locked.
·
When performing maintenance on the electrical system the main disconnect, which
supplies power from the electrical service to the machine, should be switched off.
·
Allow three minutes after turning off the power from the main electrical service to the
saw before opening any electrical enclosures. Your machine might be equipped with a
variable frequency drive unit which stores electricity inside it’s capacitors which require
a minimum of three minutes to completely discharge.
Summary of Contents for S-20H
Page 1: ...I N B A N D S A W T E C H N O L O G Y OPERATIONS MAINTENANCE M A N UA L ...
Page 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 6: ...SECTION 1 INSTALLATION SECTION 1 INSTALLATION ...
Page 7: ...SECTION 1 INSTALLATION ...
Page 10: ...Pg 3 S22Hce 2002a LAYOUT DRAWINGS ...
Page 11: ...Pg 4 S22Hna 2002a ...
Page 15: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 16: ...SECTION 2 OPERATING INSTRUCTIONS SECTION 2 OPERATING INSTRUCTIONS ...
Page 17: ...SECTION 2 OPERATING INSTRUCTIONS ...
Page 24: ...SECTION 3 MAINTENANCE AND TROUBLE SHOOTING SECTION 3 MAINTENANCE AND TROUBLE SHOOTING ...
Page 25: ...SECTION 3 MAINTENANCE AND TROUBLE SHOOTING ...
Page 33: ...Pg 22 S22Hna 2002a SERVICE RECORD NOTES DATE SERVICED BY COMMENTS ...
Page 34: ...SECTION 4 ELECTRICAL SYSTEM SECTION 4 ELECTRICAL SYSTEM ...
Page 35: ...SECTION 4 ELECTRICAL SYSTEM ...
Page 39: ...ELECTRICAL SCHEMATIC WIRING DIAGRAMS ...
Page 40: ......
Page 41: ...ELECTRICAL SCHEMATIC WIRING DIAGRAMS ...
Page 42: ......
Page 43: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 44: ...SECTION 5 HYDRAULIC SYSTEM SECTION 5 HYDRAULIC SYSTEM ...
Page 45: ...SECTION 5 HYDRAULIC SYSTEM ...
Page 48: ...Pg 31 S22H 2002b S22H HYDRAULIC SCHEMATIC ...
Page 49: ...Pg 32 S22H 2002b S22H PLUMBING DIAGRAM ...
Page 50: ...SECTION 6 MECHANICAL ASSEMBLIES SECTION 6 MECHANICAL ASSEMBLIES ...
Page 51: ...SECTION 6 MECHANICAL ASSEMBLIES ...
Page 55: ...Pg 36 S22H 2002a 3 7kW HORSE POWER DRIVE OPTION with variable speed 30 ...