![Hyd-Mech S-20H Operations & Maintenance Manua Download Page 14](http://html.mh-extra.com/html/hyd-mech/s-20h/s-20h_operations-and-maintenance-manua_2191202014.webp)
Pg 7
S22Hce 2002a
POWER WIRING CONNECTIONS
When the machine has been anchored and levelled the power hook-up is the last installation step. In order to
provide safe operation and to prevent potential damage to the machine, only qualified personnel should make the
electrical connections.
As supplied your new S-20 Series II is set to run on three phase voltage or single phase. The supply voltage of
the machine is displayed on the Serial # Plate and the Voltage Label.
Connection from the Main supply is made to L1, L2, L3, (or L1 & L2 for single phase) and Ground terminals
between the contactor & transformer.
Supply conductors should be rated for the current supplied and should be protected by time delay fusing rated for
the amperage stated on the machine serial plate
CHECK FOR:
- Signs of damage to the electrical cables from shipping or installation.
- Correct phase order. The blade should be running counter clockwise.
(If the blade direction is wrong, two lines should be reversed to correct)
POWER CABLE ROUTING
The main power cable can be routed up through the bottom of the
head frame to the access holes in the end of the control panel. Cable
liquide tight reliefs should be used to secure the cable into the control
panel to ensure there is no movement of the cable when the machine is
operated.
The S-20, with "H" option control panel, opened.
L3, L2, L1 and Ground
Summary of Contents for S-20H
Page 1: ...I N B A N D S A W T E C H N O L O G Y OPERATIONS MAINTENANCE M A N UA L ...
Page 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 6: ...SECTION 1 INSTALLATION SECTION 1 INSTALLATION ...
Page 7: ...SECTION 1 INSTALLATION ...
Page 10: ...Pg 3 S22Hce 2002a LAYOUT DRAWINGS ...
Page 11: ...Pg 4 S22Hna 2002a ...
Page 15: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 16: ...SECTION 2 OPERATING INSTRUCTIONS SECTION 2 OPERATING INSTRUCTIONS ...
Page 17: ...SECTION 2 OPERATING INSTRUCTIONS ...
Page 24: ...SECTION 3 MAINTENANCE AND TROUBLE SHOOTING SECTION 3 MAINTENANCE AND TROUBLE SHOOTING ...
Page 25: ...SECTION 3 MAINTENANCE AND TROUBLE SHOOTING ...
Page 33: ...Pg 22 S22Hna 2002a SERVICE RECORD NOTES DATE SERVICED BY COMMENTS ...
Page 34: ...SECTION 4 ELECTRICAL SYSTEM SECTION 4 ELECTRICAL SYSTEM ...
Page 35: ...SECTION 4 ELECTRICAL SYSTEM ...
Page 39: ...ELECTRICAL SCHEMATIC WIRING DIAGRAMS ...
Page 40: ......
Page 41: ...ELECTRICAL SCHEMATIC WIRING DIAGRAMS ...
Page 42: ......
Page 43: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 44: ...SECTION 5 HYDRAULIC SYSTEM SECTION 5 HYDRAULIC SYSTEM ...
Page 45: ...SECTION 5 HYDRAULIC SYSTEM ...
Page 48: ...Pg 31 S22H 2002b S22H HYDRAULIC SCHEMATIC ...
Page 49: ...Pg 32 S22H 2002b S22H PLUMBING DIAGRAM ...
Page 50: ...SECTION 6 MECHANICAL ASSEMBLIES SECTION 6 MECHANICAL ASSEMBLIES ...
Page 51: ...SECTION 6 MECHANICAL ASSEMBLIES ...
Page 55: ...Pg 36 S22H 2002a 3 7kW HORSE POWER DRIVE OPTION with variable speed 30 ...