![Hyd-Mech S-20H Operations & Maintenance Manua Download Page 20](http://html.mh-extra.com/html/hyd-mech/s-20h/s-20h_operations-and-maintenance-manua_2191202020.webp)
Pg 11
S22Hna 2002a
Optimum Blade Pitch ( T.P.I. ) for Material Width ( Inches )
DETERMINE OPTIMUM BLADE PITCH - TEETH PER INCH (T.P.I.)
Selecting a blade with proper tooth pitch is important in order to achieve optimal cutting rates and good blade
life.
For cutting narrow or thin wall structural materials a fine, blade with many teeth per inch (T.P.I.)is recommended.
For wide materials a blade with a coarse pitch should be used. See the sketch below for the blade pitch changes
fordiffering effective material widths.
It is impractical to change the blade to the proper pitch every time a different width of material is cut and it is not
necessary, but remember that the optimum blade will cut most efficiently. Too fine a blade must be fed slower on
wide material because the small gullets between the teeth will get packed with chips before they get across and out
of the cut. Too coarse a blade must be fed slower because it has fewer teeth cutting and there is a limit to the depth
of a cut taken by each tooth.
(
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
90, 140
90, 140
90, 140
90, 140
90, 140
140, 220
140, 220
140, 220
140, 220
140, 220
90, 140
90, 140
90, 140
90, 140
90, 140
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
140, 220
310
310
310
310
310
220
220
220
220
220
( in SFM )
( in SFM )
( in SFM )
( in SFM )
( in SFM )
Summary of Contents for S-20H
Page 1: ...I N B A N D S A W T E C H N O L O G Y OPERATIONS MAINTENANCE M A N UA L ...
Page 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 6: ...SECTION 1 INSTALLATION SECTION 1 INSTALLATION ...
Page 7: ...SECTION 1 INSTALLATION ...
Page 10: ...Pg 3 S22Hce 2002a LAYOUT DRAWINGS ...
Page 11: ...Pg 4 S22Hna 2002a ...
Page 15: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 16: ...SECTION 2 OPERATING INSTRUCTIONS SECTION 2 OPERATING INSTRUCTIONS ...
Page 17: ...SECTION 2 OPERATING INSTRUCTIONS ...
Page 24: ...SECTION 3 MAINTENANCE AND TROUBLE SHOOTING SECTION 3 MAINTENANCE AND TROUBLE SHOOTING ...
Page 25: ...SECTION 3 MAINTENANCE AND TROUBLE SHOOTING ...
Page 33: ...Pg 22 S22Hna 2002a SERVICE RECORD NOTES DATE SERVICED BY COMMENTS ...
Page 34: ...SECTION 4 ELECTRICAL SYSTEM SECTION 4 ELECTRICAL SYSTEM ...
Page 35: ...SECTION 4 ELECTRICAL SYSTEM ...
Page 39: ...ELECTRICAL SCHEMATIC WIRING DIAGRAMS ...
Page 40: ......
Page 41: ...ELECTRICAL SCHEMATIC WIRING DIAGRAMS ...
Page 42: ......
Page 43: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 44: ...SECTION 5 HYDRAULIC SYSTEM SECTION 5 HYDRAULIC SYSTEM ...
Page 45: ...SECTION 5 HYDRAULIC SYSTEM ...
Page 48: ...Pg 31 S22H 2002b S22H HYDRAULIC SCHEMATIC ...
Page 49: ...Pg 32 S22H 2002b S22H PLUMBING DIAGRAM ...
Page 50: ...SECTION 6 MECHANICAL ASSEMBLIES SECTION 6 MECHANICAL ASSEMBLIES ...
Page 51: ...SECTION 6 MECHANICAL ASSEMBLIES ...
Page 55: ...Pg 36 S22H 2002a 3 7kW HORSE POWER DRIVE OPTION with variable speed 30 ...