Pg 5
S22Hce 2002a
LIFTING THE S-20 SERIES II
The S-20 is shipped with a shipping pallet attached
to the saw. When lifting the pallet with a forklift truck
make sure that the load is firmly balanced. The
following photo shows a lift truck lifting the saw and
pallet from the correct side. The pallet length dimension
is 87” (213cm). Minimum fork length of 72” (182cm) is
recommended to safely lift the pallet.
WRAPPED FOR SHIPPING
The S-20 Series II is shrink-wrapped for shipping
from our plant. Remove the wrapping from around the
saw. Complete the inspection for signs of damage. The
photo shows the floor mounting plates located at the
corners of the saw. Undo the bolts that hold the saw to the pallet. Retain
these bolts to use for levelling. The larger diameter hole is used for
retaining during shipping and for use with concrete floor anchors. The
smaller diameter, threaded holes at each corner are used for levelling the
saw properly.
REMOVING THE SAW FROM SHIPPING SKID
Lift the right (drive) side of the saw as shown with a lift truck and
place two blocks under the saw as shown. With a lift truck (fork
length 60” (150cm) and rated for 1800lb (810kg) minimum), lift the
saw from the skid at the FRONT of the machine as shown and place
it where required.
Lifting the packaged S-20 Series II with a lift truck.
Bolt holding the saw to the skid (4
places).
Blocks placed under the saw.
Lifting the machine with a lift truck from the front
of machine.
Summary of Contents for S-20H
Page 1: ...I N B A N D S A W T E C H N O L O G Y OPERATIONS MAINTENANCE M A N UA L ...
Page 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 6: ...SECTION 1 INSTALLATION SECTION 1 INSTALLATION ...
Page 7: ...SECTION 1 INSTALLATION ...
Page 10: ...Pg 3 S22Hce 2002a LAYOUT DRAWINGS ...
Page 11: ...Pg 4 S22Hna 2002a ...
Page 15: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 16: ...SECTION 2 OPERATING INSTRUCTIONS SECTION 2 OPERATING INSTRUCTIONS ...
Page 17: ...SECTION 2 OPERATING INSTRUCTIONS ...
Page 24: ...SECTION 3 MAINTENANCE AND TROUBLE SHOOTING SECTION 3 MAINTENANCE AND TROUBLE SHOOTING ...
Page 25: ...SECTION 3 MAINTENANCE AND TROUBLE SHOOTING ...
Page 33: ...Pg 22 S22Hna 2002a SERVICE RECORD NOTES DATE SERVICED BY COMMENTS ...
Page 34: ...SECTION 4 ELECTRICAL SYSTEM SECTION 4 ELECTRICAL SYSTEM ...
Page 35: ...SECTION 4 ELECTRICAL SYSTEM ...
Page 39: ...ELECTRICAL SCHEMATIC WIRING DIAGRAMS ...
Page 40: ......
Page 41: ...ELECTRICAL SCHEMATIC WIRING DIAGRAMS ...
Page 42: ......
Page 43: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 44: ...SECTION 5 HYDRAULIC SYSTEM SECTION 5 HYDRAULIC SYSTEM ...
Page 45: ...SECTION 5 HYDRAULIC SYSTEM ...
Page 48: ...Pg 31 S22H 2002b S22H HYDRAULIC SCHEMATIC ...
Page 49: ...Pg 32 S22H 2002b S22H PLUMBING DIAGRAM ...
Page 50: ...SECTION 6 MECHANICAL ASSEMBLIES SECTION 6 MECHANICAL ASSEMBLIES ...
Page 51: ...SECTION 6 MECHANICAL ASSEMBLIES ...
Page 55: ...Pg 36 S22H 2002a 3 7kW HORSE POWER DRIVE OPTION with variable speed 30 ...