8/2/00
HV22
Hose Connection Diagram for Vertical Lift Gate Operators
Gold
Red
silver
Splices
Red
Gold
Red
Gold
Road Surface
hydraulic motor
Hydraulic Motor
Clockwise rotation,
closes gate
Counterclockwise rotation
closes gate
Pull longest hoses into bottom of
farthest post, gold and red ends at the
post, gold and silver ends at power/
pump enclosure.
Right hand vertical lift gate shown
From protected side
(Left hand opposite)
Pull short hoses into bottom of
nearest post, gold and red ends at
post, red and silver ends at pump/
power enclosure.
Pump
At posts, mate red to red and gold to gold. At power/pump enclosure, mate gold to gold and red to red on the pump
and splice the two silver ends together with the connector that is supplied.