11
5.
Attentions prior machine operations:
As soon as the machine is securely installed. the antirust grease will be cleaned
off together with the unclean elements. An overall Lubrication must be
performed as instructed in Chapter IV.
1.
Inspect if the planning head is adjusted to the distance distred and the lever is
properly locked.
2.
All Locking screws on the vertical, horizontal and longitudinal sliding parts
of the table must be loosely.
3.
Move the table vertical, transversely and longitudinally to the farthest ends by
the feed crank munally, check if all the sliding parts move normanlly.
4.
Check if the index dial worm match with the worm gears locked up tightly.
6.
How to operate the machine:
1.
To start and stop the electric motor:
1)
The pushbutton of
“
ON
”
for starting motion.
2)
The pushbutton of
“
OFF
”
for stop motion.
2.
Planning head operation:
1)
Velocity changes of main spindle:
Only change speeds when machine is running.
Summary of Contents for 19002
Page 1: ...HU 200K...
Page 8: ...7 FOUNDATION 2 FRONT HU 200K...
Page 17: ...16 Photo C Photo D Photo C D...
Page 34: ...33 HU200K...
Page 36: ...35 HU200K...
Page 39: ...38 HU200K...
Page 42: ...NOTE 3 4 Coolant ON OFF Switch 5 Ram JOG Button 6 Emergency Stop Button...
Page 48: ...NOTE 9 ELECTRIC CIRCUIT DIAGRAM...
Page 50: ...NOTE 11...
Page 53: ...2019 V1...