9
3.
UNIT AND INSTALLATION
4-1. TRANSPORT INSTRUCTION AND SAFETY:
(1)
For the safety transport of the machine. The lifting hooks (
∮
33MM ) is
provided with each machine. And the hool on the machine top are
pre-installated ex work for this purpose.
(2)
Use belts or tables going through hooks as shown in ligure to transport the
machine. Always keep the balance of machine during transport.
(3)
Be sure to tighten the lifting hook.
(4)
To transport the machine by forklift, be sure to tighten four holes on the
pallet.
4-2. The machine is to be installed on the solid level base of cement concret. It
is essential to test the accuracy by the water level so that it may no affect
the working precision.
4-3. Water level method:
In order to upkeep the machine’s accuracy, the water level testing must be
prudently carried out. Firstly wipe the table surface until it is perfectly
clean then place the tester onto the central part of the work table. The is
to check if every part of the table is in perfect leveling.
4-4. Power source connection:
There are wires behind the machine body to be connected with the power
source. The giant gear should be turhedd according to the allowed
direction for accuracy.
Summary of Contents for 19002
Page 1: ...HU 200K...
Page 8: ...7 FOUNDATION 2 FRONT HU 200K...
Page 17: ...16 Photo C Photo D Photo C D...
Page 34: ...33 HU200K...
Page 36: ...35 HU200K...
Page 39: ...38 HU200K...
Page 42: ...NOTE 3 4 Coolant ON OFF Switch 5 Ram JOG Button 6 Emergency Stop Button...
Page 48: ...NOTE 9 ELECTRIC CIRCUIT DIAGRAM...
Page 50: ...NOTE 11...
Page 53: ...2019 V1...