17
7.
Set-up and commissioning
7.1 Set-up
7.2 Commissioning
WARNING/CAUTION!
Because of possible spark formation, combustion engine units and electrical
equipment cannot be used in an explosion-risk area. Units with combustion
engines must not be used in enclosed spaces, as there is a danger of poisoning
and/or asphyxiation!
The unit is to be set up in a suitable location (secure location / flat surface / sufficient distance
from vehicles, loads, sources of ignition, etc.).
HURST units work perfectly at an angle of up to 20°. However, in order to guarantee maximum
safety and fluid withdrawal, they should be operated in as horizontal a position as possible.
ATTENTION!
Never mix up the fuel and hydraulic fluid tanks when filling the tank; this can
damage the power unit!
NOTE:
The engine oil level must be inspected before the first commissioning or after
longer periods of storage. First fill the engine or top up the engine oil!
For safety reasons, HURST power units do not contain engine oil upon delivery!
7.2.1 First commissioning
- Power unit without engine oil, hydraulic fluid and gasoline.
1. Pour in the engine oil according to the instructions
in the scope of delivery included with the separate
manufacturer operating instructions regarding the filler
opening (engine oil filler cap, see chapter "Installation of
the power unit").
2. Pour hydraulic oil into the hydraulic fluid tank until the fill
level indicator in the viewing window is between MIN/
MAX (see illustration on the right). The upper mark
shows the absolute fill level when connecting additional
equipment with increased usable volume. The resulting
fill quantity is up to 3.0 l.
3. Pour fuel (gasoline) into the tank until the fill level is just
below the filler opening. If the power unit is resting on
an inclined surface, do not fill the tank to its maximum
capacity.
Hydraulic oil fill
level indicator
Summary of Contents for P 630 SG
Page 42: ...42 14 Notes...
Page 43: ...43...