5
NOTE:
Before adding each link, adjust the smart stop (A)
according to step 2. If using a 3 link configuration, one of
the links must be a 4” link. The link installation order may
need to be swapped so as to comply with step 2.
1. Insert the angled link into the mount until release
button locks in place.
2. Insert the dynamic link into the angled link until
the release button locks in place.
3. To remove links, press the release button (B) and
lift upward near the joint.
If using dual monitors, attach the crossbar according to the
following steps. If not, continue to Step 5.
1. Attach crossbar (A) to crossbar link (B) using crossbar link
screws (C). Tighten with 4mm hex key until secure.
2. (Optional) Attach handle (D) to crossbar by using included
screws (E). Adjust the handle to desired height. Tighten
with 4mm hex key until secure.
STEP 3: ATTACH ARM TO BASE STEM
STEP 4: ATTACH CROSSBAR TO ARM
(DUAL-MONITOR APPLICATION ONLY)
A
A
B
A
B
C
E
D
①
②
③
④
Summary of Contents for M8.1
Page 19: ...19 ...