Receiving and Unit Inspection
1 - Upon receiving your unit do a walk around and visual inspection of the unit. Make
note of any damage and contact us immediately with any issue you may have. Note: All
equipment is assembled, tested and inspected before shipping. Damage can occur during
transit, which could cause the unit to not operate correctly.
Unpacking Unit
1 - Flat bed trailer delivery: remove straps or chains securing the unit.
2 - Remove lag screws and strapping that secures the machine to the skid.
1 - Check oil and fuel levels
2 - Check blade lubrication and
hydraulic levels (if applicable)
2-A
- Check blade lubrication and
hydraulic levels.
DO NOT USE
: petroleum products,
petroleum based products, flammable
products, a vegetable oil based product.
The above products mixed with water or
straight will cause damage to your mill.
The fluid will be slippery between the
blade and wheel belting causing blade to
come off.
DO USE
: In The Summer Months tap
water. If there is a problem with pitch build
up on the blade, add 1 oz. of dish soap or
pinesol to 1 gallon of tap water. This will
help keep the blade clean and less heat.
In the Winter Months water will freeze
in the lube tank. Use regular windshield
washer fluid (usually blue in color) If there
is a pitch build up problem add the 1 oz. of
dish soap or pinesol.
Adjustment: Before starting the engine,
adjust the flow of lube to the blade by
adjusting the flow shut off valve so there is
a constant drip. If more lube is necessary,
continue to adjust the valve until the
desired flow is acquired.
3 - Be sure the blade is sharp and tight
4 - Be sure all levers and switches are in
the neutral/center position before starting
the engine (if applicable)
5 - Be sure all persons are clear of the
equipment
6 - Make sure the unit is level and sta-
ble.
Moving the Unit
(Forklift is needed for track units)
1 - Machine needs to be lifted at the lift point, see picture
for points.
a. Use a safety devise for lifting to avoid any
damage/injury.
2 - Move unit to operator's site, lower unit and remove
unit from forks.
Before operating the Hud-Son Saw Mill
the following procedures need to be performed:
Start Engine Procedure
1 - Summer Use: Be sure to let the unit idle for at least 5 minutes before any use.
2 - Winter Use: Be sure to let the unit idle for at least 15 minutes before any use.
3 - If the unit has been sitting for a period of time, allow the unit to run long enough to
have the oil do a complete circulation before use.
6