6
4
—
Thermometer hole
2. Instrument operating instructions and matters needing attention
⑴
The instrument must be reliable grounding, power entrance lead into AC220V power.
⑵
Open tank cover, and take out the test cell, we should shut the tank cover, when heating
and testing the dielectric loss.
⑶
The cover is protective and when you open it, will interrupt the heating and high pressure.
⑷
During the test, there is high pressure and high temperature. Do not contact the test cell,
cable and socket when the power is electrify and testing.
⑸
Take care in order to avoid sprinkling the oil into the slot of test cell and the top panel
when injecting and discharging oil.
⑹
If it appears dead stop faults phenomenon while testing, turn the system back on, and
restart the instrument.
Use the appropriate power supply cables.
Only use the product-specific power supply line in accordance with the product specification.
Be right to disconnect and connect.
The instrument must be adequately grounded.
In addition to the power line grounding conductor grounding, product shell’s grounding
columns must be grounded
In order to prevent electric shock, the grounding conductor must be connected with the
ground.
Before connecting with the input or output terminals of the product, make sure that the
product is properly grounded.
Note that rating value of all terminals.
To prevent fire or electric shock hazard, please note that all rating values and markings in the
product.
Before connecting this product, please read the product manual in order to further understand
the information about rating values.
Use the appropriate protective tube.
Use only the protective tube in accordance with provisions of this product type and rating.
Do not operate when there is any suspicion of failure. If you suspect this product is damaged,
please contact our repair staff to check, and do not continue the boot operation.