Acceptance Manual
Tecal RH2485 V2 Server
Part II Operation Guide
20
Objective
To verify the hot swap function for the LSI SAS2208
Test Networking
Diagram
None
Preset Conditions
The server is powered on.
You have configured RAID 1 properties by using two hard disks, synchronized data
between hard disks, and installed an OS.
Test Procedures
1.
Power on the server.
2.
After the OS starts, remove a RAID 1 member disk.
3.
Install a new hard disk of the same model, and check the hard disk indicator
state.
4.
Check the hard disk indicator state after a time period.
Expected Result
1.
In step 3, the yellow and green hard disk indicators blink at the same frequency,
which means that data is being synchronized between the two hard disks.
2.
In step 4, after data is synchronized for the new hard disk, the green indicator is
steady on, and the yellow indicator is off.
Test Description
The time period in step 4 ranges from half an hour to 8 hours, depending on the model
and capacity of the hard disk.
T06 Verifying the PXE Function on Network Ports
T06-01 Verifying the PXE Function on Network Ports
T06-0101 Verifying the PXE Function on Network Ports
Objective
To verify that the network ports on the server support the PXE function
Test Networking
Diagram
None
Preset Conditions
1.
The server is powered on.
2.
The DHCP server is configured properly.
3.
The installation server is configured properly.
4.
The DHCP server and installation server are connected to the rear service
network port (onboard Ethernet port) over a network.
Test Procedures
1.
Connect power cables to the server, and power on the server.
2.
Press
F12
on the first BIOS screen.
Expected Result
1.
The server starts over the PXE.
2.
An IP address is obtained for the server.
3.
The server starts to install an OS over the network.
Test Description
None