![Huawei SUN2000-43KTL-IN-C1 User Manual Download Page 66](http://html.mh-extra.com/html/huawei/sun2000-43ktl-in-c1/sun2000-43ktl-in-c1_user-manual_168515066.webp)
SUN2000-43KTL-IN-C1
User Manual
5 Connecting Cables
Issue 07 (2018-05-06)
Copyright © Huawei Technologies Co., Ltd.
60
Step 6
Install the terminal base on the terminal block, and connect the shield layers to the ground
point.
When connecting the shielded cables, choose whether to crimp the OT terminal based on site
requirements.
Figure 5-27
Connecting communications cables
Step 7
Bind communications cables after connecting them.
Figure 5-28
Binding communications cables