Multimeter
Phillips screwdriver
Flat-head screwdriver
Rubber mallet
Electrician's knife
Measuring tape
Step ladder (2 m)
Firestop putty
Insulated gloves
Cable cutter
Pallet truck
Protective shoes
Insulation tape
Level
Protective gloves
Heat gun
Hammer drill
This table may not list some tools required at specific sites. Onsite installation personnel and
technical support personnel should prepare tools based on site requirements.
Prepare firestop putty for sealing cable holes after cable connection. Huawei does not provide
the firestop putty. The customer needs to purchase it.
NOTE
2
Phase sequence
meter
Cable tie
3
Acceptance Guide
After the equipment is delivered to the installation site, representatives from the customer and
Huawei unpack and inspect the equipment together.
If any damage is found, report it to the carrier immediately.
Unpacking and Acceptance
3.1
NOTE