4. Connect the UPS output power cables.
5. Connect the mains output power cables for
air conditioners and other loads.
a. (Optional) MCCB output scenario
b. (Optional) Single-phase output
with a 1P output switch
c. (Optional) Single-phase output
with a 2P output switch
9