Performing the Post-installation Check
12.1
Post-installation Checklist
W hen the installation is complete, double check that these items have been properly performed.
No.
What to Check For
1
The cabinets are positioned in the places defined by the site-specific engineering design.
2
The subrack(s) and other components are properly installed and are free of damage or loose
parts. No fingerprints, scratch marks, or other stains are present on the cabinets.
3
Cable holes at the top and bottom of the cabinets are securely sealed.
4
Cables are routed according to the engineering design.
5
Cables are not damaged, broken, or spliced. The cable connectors are connected correctly and
securely.
6
Labels at both ends of each cable and fiber are marked correctly, clearly, and neatly.
7
The fibers routed outside a cabinet are protected in a pipe or trough, and are protected from
being pulled out or pressed against by other cables or objects.
8
The bending radius of fibers is not less than 8 mm. There are no sharp components along the
routing path for the fibers.
9
Fibers are placed in order and are properly bound with fiber binding tape. There are no sharp
edges.
10
Fibers are properly routed without causing inconvenience to installing/uninstalling the side panels
of the cabinet.
11
Any vacant slots are covered with filler panels, and no devices are located in the air inlet and
exhaust areas.
12
The cabinet holding the subrack has one dustproof sponge installed on the interior side of the
cabinet door (either front or rear door).
75