
Introduction to PSUs
62
Installing Power Cables
—
PSU
c
PSU (with the plastic
cover removed)
PSU (with the plastic
cover installed)
1.
The label below advises you to read
corresponding manuals before
operating the equipment.
2. The equipment is powered off only
after all power inputs to each PSU
board are disconnected.
WARNING
M3
0.59
±
0.06 N·m
2# screwdriver
Install the OT terminals on the
power cables according to the
instructions on the plastic
cover of each PSU board.
Ensure that the terminals are
installed correctly.
CAUTION
63 A Power Input
M6
5.10
±
0.51 N·m
3# screwdriver
63 A
PSU PSU PSU PSU PSU EFI
PSU PSU PSU PSU PSU