
63 A + 125 A Power Input
Install the copper fitting (long) (RTN+) and power cable (RTN+).
M6
3# screwdriver
5.10
±
0.51 N·m
Copper fitting
(long)
Power cable
(RTN+)
64
c
Installing Power Cables
—
PSU
•Install the OT terminals on the
power cables according to the
instructions on the plastic cover
of each PSU board. Ensure that
the terminals are installed
correctly.
•Connect the power cables to
the screws on the left legs of
the copper fittings.
CAUTION