
Unit: mm
Installation Holes
Multi-purpose fiber
management cabinets U32Enhanced
300
Mark the installation holes on the
floor using a marker.
300
Back
Line-drawing
Template
Front
198
80
300
61
Unit: mm
300
300
600
31
Determining the Installation Position for the Multi-Purpose Fiber
Management Cabinets
Attach a plumb line on the cable rack above the multi-
purpose fiber management cabinets to be installed. Use
a marker to mark the point where the plumb bob
contacts the floor.
Repeat step 1 to mark another point on the floor.
Then draw a line between the two points using a
powder marker.
The positioning method is for reference only. The actual
installation position depends on the project engineering
drawing.
NOTE
Concrete Floor : Determining the Installation Holes
Installing Type-A Multi-Purpose Fiber Management Cabinets
8.2
Preparations for Installing Type A Multi-Purpose Fiber Management Cabinets