Installation Manual
iSiteC BTS3601C CDMA Base Station
Hardware Installation
2
Installing Cabinet Hardware
2-5
4)
Installing cables
Connect cables among all above equipment after their installation. Cables include
transmission cables, power cables and grounding cables.
5)
Installing antenna and feeder system
Installing antenna and feeder system is to install antennae, prepare connectors, etc.
6)
Installing GPS antenna and feeder system
Installing GPS antenna and feeder system is to install GPS receive antenna and
lightning arrester, prepare connectors, etc.
7)
Checking hardware installation
Check the installation quality and accept the installation of BTS hardware upon
completion.
2.2 Installation Planning
Following are several typical installation layout examples for reference.
2.2.1 Example of Indoor Wall Installation
Figure 2-3 shows the indoor wall installation of BTS with IAFB.
1) Front view
2) Side view
3) BTS3601C
4) IAFB
5) Feeder window
6) Indoor grounding bar
7) Protection Ground (PGND) bus
8) Global Positioning System (GPS) feeder 9) Jumper
10) BTS PGND cable
11) Power cable
12) Fiber
13) IAFB grounding bar
Figure 2-3
Installing BTS on the wall