I n s t a l l a t i o n M a n u a l
i S i t e C B T S 3 6 0 1 C C D M A B a s e S t a t i o n
H a r d w a r e I n s t a l l a t i o n
1 I n s t a l l a t i o n P r e p a r a t i o n s
1 -6
1.4 I n s t a l l a t i o n E n v i r o n m e n t C h e c k
During the project preparation, the office personnel shall perform "first check prior to
the installation" with survey engineers according to the engineering guidebook and
then the second check with the project supervisor and fill in the check items in
Installation Environment Checklist
accordingly. The purpose is to check whether the
environment is suitable for the deployment.
1.5 Project Plan and Kickoff Coordination
1.5.1 Project Plan
After confirming the qualification of engineering environment, project supervisor should
contact the representative of the user, and draft and notify the user the initial plan list of
installation planning and progress according to the condition and preparation of the
project.
I. Project interface
In principle, Huawei's
Project Recommendation
and the terms and conditions related to
project interface after the negotiation between user and vendor serve as the basis of
operation. Below are the common principles:
l
The user is responsible for the preparation of equipment room environment;
l
The user is responsible for the coordination of the auxiliary equipment in the
equipment room;
l
The project i nterface is based on the contract and project files and is finalized by
means of the negotiation between both parties.
II. Project coordination and cooperation
l
Personnel
The project supervisor is the principal of the project. He is responsible for providing th e
list of the supervisors of this project and sub-projects and the way to contact them. It is
recommended that the user provide the list and contact information of its corresponding
technicians.
l
Tools
The vendor should in advance inform the user of the tools inconvenient for
transportation or tools the vendor cannot provide. And the user should provide these
tools.