20
Installing the AP
Lightning rod
5GHz antenna
Lightning rod
Protection
angle
>1.0m
Hose
clamp
Antenna
pole
RF cable
2.4GHz
antenna
RF cable
AP6610DN-AGN
Ground wire
Power line
AC Power
100V~240V
Figure 6
AP6510DN-AGN
>0.5m
>0.5m
Ground wire
Ultra-5 cable
PoE adapter
Omnidirectional
outdoor antenna
Lightning rod
5GHz antenna
RF cable
2.4GHz
antenna
RF cable
AC Power
100V~240V
Pressing the Reset Button
The Reset button on an outdoor AP is protected by a waterproof screw. Before pressing the Reset button,
remove the waterproof screw.
Keep the screw properly and install it again after pressing the Reset button.
Requirements for laying Out Cables
Requirements for laying out ground cables
(1) All ground cables must be connected to a ground bar.
(2) The ground cable cannot be led in aerially, but buried in the earth or arranged indoor.
(3) Both ends of the external conductor of the coaxial cable and those of the insulation of the shielded cable
should have good electric contact with the metal shell of the equipment they connect to.
(4) Ground cables must be separated from signal cables to reduce interference between them.
(5) Do not add any switch or fuse on the ground cable.
(6) Do not use another device for an electrical connection with the ground cable.
(7) All metal components in the shell must be securely connected to the ground cable.