Figure 2-1
Installation flowchart
2.3 Unpacking the Equipment
Before unpacking the carton, ensure that the packing carton is intact and not damaged or
soaked. Stop unpacking if the equipment is rusted or soggy. Then, investigate causes and
contact the supplier.
After unpacking, check items in the carton against the packing list. If any item is missing,
contact the supplier or agent.
Usually, the packing list contains the following items.
l
Remote Unit
l
Expansion screws
l
Screw
l
Quick start guide
l
Warranty card
l
MAC address label
l
SN label
2.4 Determining the Installation Position
l
Do not deploy the device in places with high temperature, dust, noxious gas, unstable
voltage, much vibrations, or strong noise, or in places near flammable or explosive
materials and interference sources such as a large radar station, radio station, and
transformer station.
R250D
Hardware Installation and Maintenance Guide
2 AP Installation
Issue 01 (2016-09-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9