GENERAL INFORMATION
1-32
2. Lubricate the drive chain.
3. Start the engine and allow it to reach operating temperature. Drain the engine oil regardless of the
riding time since the last service. Fill the engine with the recommended type of oil.
4. Drain the fuel tank, fuel lines and carburetor.
5. Remove the spark plug and ground the ignition system with a grounding tool as described in this
chapter. Then pour a teaspoon (15-20ml) of engine oil into the cylinder. Place a rag over the
opening and Start the engine over to distribute the oil. Remove the grounding tool and reinstall the
spark plug.
6. When the engine has cooled to room temperature, drain the cooling system drain the coolant in
the coolant reserve tank and all tank lines.
7. Cover the exhaust and intake opening.
8. Apply a protective substance to the plastic and rubber components. Make sure to follow the
manufacturer’s instructions for each type of product being used.
9. Place the UTV on a work stand with both wheels off the ground.
10. Cover the UTV with old bed sheets or something similar. Do not cover it with any plastic material
that will trap moisture.
Returning the UTV to Service
The amount of service required when returning a UTV to service after storage depends on the
length of non-use and storage conditions. In addition to performing the reverse of the procedure, note
the following:
1. Remove the covers from the intake and exhaust openings.
2. Service the air filter as described in Chapter Three.
3. Inspect the cooling system. Check the drain plug and hose connections for leaks.
4. Refill the fuel tank. Turn the fuel shutoff valve on and check for fuel leaks.
5. Make sure the brakes, clutch, throttle and engine stop switch work properly before operating the
UTV. Evaluate the service intervals to determine which areas require service.
6. If the UTV has been in storage for longer than four months, change the engine oil as and filter, and
the transmission oil as described
Summary of Contents for UTV 700 2009
Page 1: ...HUANSONG UTV 700 SERVICE MANUAL 2009 ...
Page 96: ...GENERAL SPECIFICATIONS 2 23 HYDROGRAPHIC CHART Hydrographic chart Pressure splash ...
Page 97: ...GENERAL SPECIFICATIONS 2 24 LUBRICATION OIL WAY ...
Page 246: ...5 31 BRAKE SYSTEM No Part Name Qty Remarks 26 Caliper piston seal 1 27 Bleed screw 1 ...
Page 330: ...CHARGING SYSTEM 6 18 CHARGING SYSTEM CIRCUIT DIAGRAM Ignition coil C D I Magneto Rectifier ...