Component overview (draw lead bolt / detachable conductor bolt)........................ 23
Removing the draw lead bolt / detachable conductor bolt......................................25
Mounting the electrode on the transformer side (option)........................................27
Mounting the bushing on the transformer.........................................................29
Connecting draw lead bolt / detachable conductor bolt to the transformer
Mounting the head armature of the bushing (with draw lead bolt / detachable
Connecting undetachable conductor bolt to the transformer connection (option
Preparation for commissioning.............................................. 38
Maintenance.............................................................................. 41
Check and clean insulator surface (silicone insulator).................................... 41
Check the temperature using a thermal image................................................. 48
Repair.........................................................................................49
Range STARIS®-Sia+
3/53