
9
Leveling the EXR Audio Stand -
The EXR Audio Stand System is now ready to
be leveled. Place the provided level on the top EXR Horizontal Support Assembly
and apply gentle pressure against each side of the stand to see if it rocks back and
forth. If the stand does rock back and forth and/or does not sit level, thread out the
point(s) that must be extended to level the stand
1
/
4
turn at a time until the stand is
level with all four points in contact with the ground. Do not thread out the point(s)
more than five full rotations. Each point must have three full rotations of
engagement with the thread for proper performance and strength.
If more adjustment is required, place a shim under the point(s) so that the additional
travel is achieved without violating the three full thread minimum engagement
requirement.
Once the system is level, hold the extended point(s) with one hand and thread the
washer down with your other hand back against the top of the point. Gently torque
all four washers against the tops of the points with the HRS Grip Pad. This will
lock the points into place and prevent any motion out of the threaded connection.
The result should be a very stable, firm, and level structure.
Installing HRS Isolation Bases into the EXR Frame (optional)
- If your system
includes HRS Isolation Bases, unpack each base that will be installed in the EXR
Audio Stand System. Make sure to read and follow all of the instructions in the
isolation base manual prior to installing bases into the EXR. Also verify that the
EXR size matches the isolation base size.
Note the load range of each isolation base to determine which component of your
system each base is matched to. Matching the isolation base to the proper
component weight will ensure optimum performance. Load ranges can be changed
for a nominal factory fee, so if you do not have the correct load range for a
component, please contact Harmonic Resolution Systems or your local certified
retail location to have this corrected.
Load the isolation bases into the EXR Audio Stand System with the HRS logo
facing the front of the system. Carefully pass each isolation base between the front
struts of the stand, and have another person support the rear edge while you both
gently lower the base to contact the shelf surface. Sliding isolation base feet along
the shelf surfaces may scratch them. Make sure that the outside edges of each
isolation base line up with the outside edges of the EXR Horizontal Support
Assembly.