Installing an energy pack
Installing an energy pack
Prerequisites
Prerequisites
Before proceeding the installation, observe following guide line:
Make sure that a compatible type-p storage controller is installed .
Make sure that you have the storage controller backup power cable that ships with the storage controller.
Procedure
Procedure
1. If physically powering down a server with the front bezel installed, remove the front bezel .
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Place the server on a flat, level work surface.
8. Install the energy pack:
a. Insert the energy pack in the holder (callout 1).
Make sure that the energy pack is locked in the holder.
b. Route the energy pack cable across the midwall cable channel (callout 2).
c. Connect the energy pack cable (callout 3).
9. Connect the storage controller backup power cable .
11. Install the server into the rack .
12. Connect all peripheral cables to the server.
13. Connect the power cords:
Installing an energy pack
125
Summary of Contents for ProLiant DL20 Gen10 Plus
Page 20: ...DIMM slot location The arrow points to the front of the server DIMM slot location 20 ...
Page 30: ...Fan numbering Fan numbering 30 ...
Page 100: ...Installing an optical drive in the LFF drive chassis 100 ...
Page 169: ...Energy pack cabling Energy pack cabling 169 ...
Page 174: ...M 2 SATA SSD add in card cabling 174 ...
Page 177: ...Chassis intrusion detection switch cabling Chassis intrusion detection switch cabling 177 ...
Page 178: ...Serial port cabling Serial port cabling 178 ...
Page 180: ...Power supply cabling 180 ...
Page 185: ...Troubleshooting NMI functionality Troubleshooting resources Troubleshooting 185 ...
Page 196: ...Ukraine RoHS material content declaration Ukraine RoHS material content declaration 196 ...