
Energy pack specifications
Energy pack specifications
Feature
Feature
Description
Description
Time required to recharge Smart Storage Battery
12 W: 1 hour (For maximum load of 3 devices)
Duration of Smart Storage Battery backup
150 seconds (maximum support)
The Smart Storage Battery provides a sufficient duration to
transfer the cached data from DDR memory to flash memory,
where the data remains indefinitely or until a controller retrieves
the data.
For more information, see the QuickSpecs document
QuickSpecs document for the Smart Storage Battery.
Energy pack specifications
124
Summary of Contents for ProLiant DL20 Gen10 Plus
Page 20: ...DIMM slot location The arrow points to the front of the server DIMM slot location 20 ...
Page 30: ...Fan numbering Fan numbering 30 ...
Page 100: ...Installing an optical drive in the LFF drive chassis 100 ...
Page 169: ...Energy pack cabling Energy pack cabling 169 ...
Page 174: ...M 2 SATA SSD add in card cabling 174 ...
Page 177: ...Chassis intrusion detection switch cabling Chassis intrusion detection switch cabling 177 ...
Page 178: ...Serial port cabling Serial port cabling 178 ...
Page 180: ...Power supply cabling 180 ...
Page 185: ...Troubleshooting NMI functionality Troubleshooting resources Troubleshooting 185 ...
Page 196: ...Ukraine RoHS material content declaration Ukraine RoHS material content declaration 196 ...