2.

Align and install the cable management arm.

3.

Press the latch and slide the cable management arm into place.

Cabling and powering up the chassis

37

Summary of Contents for Apollo 4520 Gen9

Page 1: ...installation and configuration information for the HPE Apollo 4520 Gen9 Chassis This document is for the person who installs administers and troubleshoots servers and storage systems Hewlett Packard...

Page 2: ...ble for technical or editorial errors or omissions contained herein Confidential computer software Valid license from Hewlett Packard Enterprise required for possession use or copying Consistent with...

Page 3: ...st Bus Adapter port identification 18 I O module power connector identification 18 LFF drive bay identification 19 Expander module LEDs 19 Expander link mapping 19 Installing the chassis 20 Setting up...

Page 4: ...HPE 800W Flex Slot Platinum Hot plug Power Supply 48 HPE 800W Flex Slot 48VDC Hot plug Power Supply 48 HPE 800W Flex Slot Titanium Plus Hot plug Power Supply 50 HPE 800W Flex Slot Universal Hot plug P...

Page 5: ...dule 2 Management module 3 System fans 5 4 SAS expander module 5 Drive1 6 HPE Apollo 4520 Gen9 Chassis 7 Server 8 Power supply1 9 Power supply blank2 10 Rack rails and cable management arm2 1 The quan...

Page 6: ...r manual material handling Remove all installed components from the chassis before installing or moving the chassis Use caution and get help to lift and stabilize the chassis during installation or re...

Page 7: ...for a single row of racks or after the final row of racks Hewlett Packard Enterprise Rack products draw cool air in through the front and expel warm air through the rear of the enclosure Therefore the...

Page 8: ...is from power fluctuations and temporary interruptions with a regulating UPS This device protects the hardware from damage caused by power surges and voltage spikes and keeps the chassis in operation...

Page 9: ...components Item Description 1 Server bay 1 2 Server bay 1 LFF drives 3 Server bay 2 4 Server bay 2 LFF drives 5 Chassis serial label pull tab 6 Quick release levers 2 7 Storage LED display Storage dis...

Page 10: ...rives are rebuilding or performing a RAID migration stripe size migration capacity expansion logical drive extension or erasing Flashing amber One or more drives are predicted to fail Solid amber One...

Page 11: ...upgrade in progress 4 Hz cycle per sec iLO manual reboot sequence initiated 8 Hz cycle per sec iLO manual reboot sequence in progress Off Deactivated 3 Server health LED Solid green Normal Flashing g...

Page 12: ...er bay 2 I O module 2 Server bay 1 I O module 3 Power supply bay 4 4 Power supply bay 3 5 Power supply bay 2 6 Power supply bay 1 7 Management module Power supply LEDs The power supply LED is located...

Page 13: ...or power supply has failed Solid Green Normal Management module components Item Description 1 HPE APM connector 2 HPE iLO connector 3 Management module thumbscrew 4 Reserved 5 Management module relea...

Page 14: ...dule UID LED 2 Management module health LED 3 iLO link LED 4 iLO activity LED I O module components Item Description 1 PCIe expansion slot 4 2 PCIe expansion slot 3 3 PCIe expansion slot 2 4 PCIe expa...

Page 15: ...module with the x16 PCIe riser option I O module LEDs Item Description 1 NIC 1 activity LED 2 NIC 1 link LED 3 NIC 2 activity LED 4 NIC 2 link LED PCIe slot definitions standard I O module Processor...

Page 16: ...expansion slot 2 PCIe3 x8 8 4 2 1 4 PCIe expansion slot 1 PCIe3 x8 8 4 2 1 5 FlexibleLOM slot PCIe3 x8 PCIe slot definitions I O module with x16 riser option Processor 2 must be installed to support o...

Page 17: ...iption 1 PCIe expansion slot 4 PCIe3 x8 8 4 2 1 2 PCIe expansion slot 3 PCIe3 x8 8 4 2 1 3 PCIe expansion slot 2 PCIe3 x16 16 8 4 2 1 4 PCIe expansion slot 1 PCIe3 x8 8 4 2 1 Identifying components an...

Page 18: ...1i I O module power connector identification 1 2 3 4 Item Description 1 PCIe expansion slot 1 power connector 2 PCIe expansion slot 2 power connector 3 PCIe expansion slot 3 power connector 4 PCIe ex...

Page 19: ...ate Description Green Expander module health is good Amber Expander module fault detected Expander link mapping All 46 hard drives are accessible from either server 1 or server 2 Expander A in backpla...

Page 20: ...sembling the chassis Prerequisites Before installing the chassis into the rack you must remove the pluggable modules and system components from the chassis Because a fully populated chassis can weigh...

Page 21: ...I O module CAUTION To avoid damage to the server always support the bottom of the server when removing it from the chassis Server Installing the chassis 21...

Page 22: ...CAUTION To avoid damage to the device do not use the removal handle to carry it 2 Remove the access panel 3 Remove all LFF drives 22 Installing the chassis...

Page 23: ...4 System fans bays 1 through 4 a In bay 5 open the fan bay door b Remove the system fans from all 5 fan bays Installing the chassis 23...

Page 24: ...s for manual material handling Remove all installed components from the chassis before installing or moving the chassis Use caution and get help to lift and stabilize the chassis during installation o...

Page 25: ...ttom of the rack and then install additional chassis by moving up the rack with each subsequent chassis Plan the rack installation carefully because it is difficult to change the location of component...

Page 26: ...sh tabs and extending the rails until the rails click two times CAUTION Be sure to keep the product parallel to the floor when installing the chassis Tilting the product up or down could result in dam...

Page 27: ...ly into the rack CAUTION Press and hold the Push tab on each rail until the chassis begins to slide into the rack Then release the Push tabs and continue to slide the chassis into the rack Press and h...

Page 28: ...proper cooling and thermal damage do not operate the chassis unless all bays are populated with a component or a blank Procedure 1 Prepare the server for installation 2 Install the server When seated...

Page 29: ...injury from electric shock do not install more than one drive carrier at a time Procedure 1 Remove the drive blank 2 Prepare the low profile LFF hot plug drive for installation 3 Install the LFF hot...

Page 30: ...not disable the power cord grounding plug The grounding plug is an important safety feature Plug the power cord into a grounded earthed electrical outlet that is easily accessible at all times Unplug...

Page 31: ...the fan door For all other fans proceed to step 2 2 Push in on the tabs and then insert the system fan into the chassis IMPORTANT Use the tabs to insert the system fan into the chassis Do not push in...

Page 32: ...nning installation of the I O module expansion board options review the following requirements Single and dual installation of the HPE H240 Smart Host Bus Adapter is supported Multipath I O MPIO is su...

Page 33: ...Procedure 1 Remove the I O module 2 Remove the I O module access panel 3 Remove the PCIe blank from the expansion slot Installing the chassis 33...

Page 34: ...e PCIe slot definitions I O module with x16 riser option 5 Cable the board according to the option installed For more information see I O module option cabling Installing an I O module Install any I O...

Page 35: ...Procedure Install the component as indicated Installing the chassis 35...

Page 36: ...es over a hard corner or edge Procedure 1 Connect the network cables to the Ethernet ports on the I O module I O module components on page 14 2 Connect a network cable to the iLO connector on the mana...

Page 37: ...2 Align and install the cable management arm 3 Press the latch and slide the cable management arm into place Cabling and powering up the chassis 37...

Page 38: ...re to orient the arm with the cable trough facing upward NOTE To access some components on the rear of the product you may need to remove the cable management arm Procedure 1 Press the latch to releas...

Page 39: ...he I O modules HPE H240 Smart Host Bus Adapter cabling The HPE Apollo 4520 Gen9 Chassis supports single and dual installation for the HPE H240 Smart Host Bus Adapter The dual installation of the HPE H...

Page 40: ...le board option standard I O module and I O module with x16 riser option Dual board option standard I O module Dual board option I O module with the x16 riser option 40 Cabling and powering up the cha...

Page 41: ...wall outlet or to an installed PDU 3 Press the Power On Standby button on the server Hot plug power supply calculations For hot plug power supply specifications and calculators to determine electrica...

Page 42: ...not open this enclosure Refer all maintenance upgrades and servicing to qualified personnel This symbol indicates the presence of electric shock hazards The area contains no user or field serviceable...

Page 43: ...nd comprehensive courses of action for fault isolation and identification issue resolution and software maintenance on ProLiant servers and server blades To view the guide select a language English Fr...

Page 44: ...vailable at the Hewlett Packard Enterprise Support Center www hpe com support Safety Compliance EnterpriseProducts Additional regulatory information Hewlett Packard Enterprise is committed to providin...

Page 45: ...where Y indicates the year counting from within each new decade with 2000 as the starting point for example 238 2 for 2002 and 38 for the week of September 9 In addition 2010 is indicated by 0 2011 b...

Page 46: ...Ukraine RoHS material content declaration 46 Ukraine RoHS material content declaration...

Page 47: ...pecifications Specification Value Height 18 96 cm 7 46 in Depth 84 91 cm 33 43 in Width 44 33 cm 17 45 in Weight fully loaded with three XL450 servers 99 79 kg 220 00 lb Weight empty 43 09 kg 95 00 lb...

Page 48: ...900 W at 200 VAC 912 W at 240 VDC for China only BTUs per hour 3207 at 100 VAC 3071 at 200 VAC 3112 at 240 for China only Power supply output Rated steady state power 800 W at 100 VAC to 127 VAC input...

Page 49: ...W 800 W at 40 VDC to 72 VDC Maximum peak power W 800 W at 40 VDC to 72 VDC WARNING To reduce the risk of electric shock or energy hazards This equipment must be installed by trained service personnel...

Page 50: ...arthing of the DC system The DC system must be earthed elsewhere The DC supply source is to be located within the same premises as the equipment Switching or disconnecting devices must not be in the e...

Page 51: ...z Rated input current 4 5 A at 200 V AC 3 2 A at 277 V AC 2 3 A at 380 VDC Maximum rated input power 900 W at 200 VAC 887 W at 277 VAC 874 W at 380 VDC BTUs per hour 3071 at 200 VAC 3026 at 277 VAC 29...

Page 52: ...t 240 VAC 5459 at 240 VDC for China only Power supply output Rated steady state power 1400 W at 200 VAC to 240 VAC input 1400 W at 240 VDC input for China only Maximum peak power 1400 W at 200 VAC to...

Page 53: ...ng the system be aware of the precautions you must follow when setting up the system or handling parts A discharge of static electricity from a finger or other conductor may damage system boards or ot...

Page 54: ...tic dissipating work mat If you do not have any of the suggested equipment for proper grounding have an authorized reseller install the part For more information on static electricity or assistance wi...

Page 55: ...prise Information Library www hpe com info EIL Subscription Service Support Alerts www hpe com support e updates Insight Remote Support www hpe com info insightremotesupport docs For additional websit...

Page 56: ...mponents Accessing updates Some software products provide a mechanism for accessing software updates through the product interface Review your product documentation to identify the recommended softwar...

Page 57: ...rt agreement It provides intelligent event diagnosis and automatic secure submission of hardware event notifications to Hewlett Packard Enterprise which will initiate a fast and accurate resolution ba...

Page 58: ...ischarge IEC International Electrotechnical Commission iLO Integrated Lights Out LFF large form factor LOM LAN on Motherboard PCIe Peripheral Component Interconnect Express PDU power distribution unit...

Page 59: ...gestions or comments to Documentation Feedback docsfeedback hpe com When submitting your feedback include the document title part number edition and publication date located on the front cover of the...

Reviews: