• Dual-board option (MPIO)
Powering up the system
Procedure
1.
Connect the power cables to the power supplies.
2.
Connect the power cables to the power source (UPS or wall outlet) or to an installed PDU.
3.
Press the Power On/Standby button on the server.
Hot-plug power supply calculations
For hot-plug power supply specifications and calculators to determine electrical and heat loading for the
server, see the Hewlett Packard Enterprise Power Advisor website (
http://www.hpe.com/info/
poweradvisor/online
).
Powering up the system
41