d.
install the communication board
.
e.
2.
If the server was removed from the cradle, wall mount, or storage expansion unit:
•
Install the server in the cradle
.
•
Install the server in the wall mount
.
•
Install the server on the storage expansion unit
.
3.
If removed, install the Kensington security lock.
4.
Connect all peripheral cables to the server.
5.
Connect the power adapter to the server, and then connect the power cord to the AC source.
6.
Secure the power cord and rear panel cables based on the standard cable management practices.
.
Install the middle frame
Prerequisites
Before you perform this procedure, make sure that you have the following tools available:
• T-15 Torx screwdriver
• Flathead screwdriver
Procedure
1.
Align the middle frame with the system board.
2.
Install the first six screws according to the numbering indicated on the middle frame.
32
Install the middle frame