Interconnect bay labels
c3000 interconnect bay
c7000 interconnect bay
Server blade signal
3 and 4
5 and 6
Mezzanine 2
3 and 4
7 and 8
3 and 4
5 and 6
Mezzanine 3
3 and 4
7 and 8
For detailed port mapping information, see the HP BladeSystem enclosure installation poster or
the HP BladeSystem enclosure setup and installation guide for your product on the HP website
(
http://www.hp.com/go/bladesystem/documentation
).
Installing the server blade into the enclosure
NOTE:
When installing additional blades into an enclosure, additional power supplies might
also be needed to meet power requirements. For more information, see the HP BladeSystem
enclosure setup and installation guide for your product on the HP website (
http://www.hp.com/
go/bladesystem/documentation
).
NOTE:
Before installing and initializing the server blade, install any server blade options, such
as an additional processor, hard drive, or mezzanine card.
NOTE:
Refer to the HP Integrity BL860c i2, BL870c i2 & BL890c i2 User Service Guide for
information regarding SAS controller configuration.
1.
Remove the connector covers if they are present.
2.
Prepare the server blade for installation.
Installing and powering on the server blade
37
Summary of Contents for Integrity BL890c - i2 Server
Page 5: ...List of Tables 1 1 DIMM pair load order 27 1 2 DIMM quad load order 28 1 3 Power States 41 5 ...
Page 6: ...6 ...
Page 46: ...46 ...
Page 50: ...50 ...