Safety information
WARNING!
Wear an ESD wrist strap when handling internal server components. Acceptable
ESD wrist straps include:
•
The wrist strap that is included in the ESD kit with circuit checker (part number 9300-1609).
•
The wrist strap that is included in the ESD kit without circuit checker (part number 9300-1608).
•
The throw away strap that ships with HP memory products.
When removing and replacing server components, use care to prevent injury and equipment
damage. Many assemblies are sensitive to damage by electrostatic discharge.
Follow the safety precautions listed to ensure safe handling of components, to prevent injury,
and to prevent damage to the server blade:
•
When removing or installing a server blade or server blade component, review the
instructions provided in this guide.
•
Do not wear loose clothing that might snag or catch on the server or on other items.
•
Do not wear clothing subject to static charge build-up, such as wool or synthetic materials.
•
If installing an internal assembly, wear an antistatic wrist strap, and use a grounding mat
such as those included in the Electrically Conductive Field Service Grounding Kit.
•
Handle components by the edges only. Do not touch any metal-edge connectors or electrical
components on accessory boards.
Installation sequence and checklist
Completed
Description
Step
Unpack and inspect the server shipping container and then inventory the contents using
the packing slip.
1
Install additional components shipped with the server.
2
Install and power on the server blade.
3
Configure iLO MP access.
4
Access iLO MP.
5
Access UEFI from iLO MP.
6
Download latest firmware using HP Smart Update Manager
7
Install and boot the OS.
8
Unpacking and inspecting the server blade
Ensure that you have adequately prepared your environment for your new server, received the
components that you ordered, and verified that the server and its containers are in good condition
after shipment.
Verify site preparation
Verifying site preparation is an essential factor of a successful server blade installation, and
includes the following tasks:
•
Gather LAN information. Determine the two IP addresses for the iLO 3 MP LAN and the
server blade LAN.
•
Establish a method to connect to the server blade console. For more information on console
connection methods, see
Section : “Using iLO” (page 41)
for more information.
Safety information
17
Summary of Contents for Integrity BL890c - i2 Server
Page 5: ...List of Tables 1 1 DIMM pair load order 27 1 2 DIMM quad load order 28 1 3 Power States 41 5 ...
Page 6: ...6 ...
Page 46: ...46 ...
Page 50: ...50 ...