Powering up the server
Procedure
1. Remove the bezel.
2. Use one of the following methods to power up the server:
• Press the Power On/Standby button.
• Use the virtual power button through iLO.
Installing the bezel
Procedure
1. Install the bezel.
a. Attach the bezel to the latch ear.
b. Press the latch.
c. Close the bezel.
Removal and replacement procedures
40
Summary of Contents for HPE ProLiant DL325
Page 24: ...Customer self repair 24 ...
Page 25: ...Customer self repair 25 ...
Page 26: ...Customer self repair 26 ...
Page 61: ... SFF a Remove the optical drive cage b Remove the blank Removal and replacement procedures 61 ...
Page 136: ... Slot 2 Slot 3 Cabling 136 ...
Page 139: ... Slot 2 Slot 3 Cabling 139 ...
Page 145: ... SFF Cable routing Power supply Non hot plug power supply Cabling 145 ...
Page 149: ...Cable routing Serial port Cabling 149 ...
Page 152: ... Slot 2 Slot 3 Cabling 152 ...