Warnings and cautions
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
CAUTION: Electrostatic discharge (ESD) can damage electronic components. Be sure that you are properly
grounded (earthed) before beginning any installation procedure.
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all PCI slots have
either an expansion slot cover or an expansion board installed.
Preparation procedures
To access some components and perform certain service procedures, you must perform one or more of the following
procedures:
Procedure
• If installed,
•
•
Extend the server from the rack.
•
Remove the server from the rack.
•
Access the product rear panel.
•
•
Removing the bezel
Procedure
1. Remove the Kensington security lock.
2. Remove the bezel.
a. Press the latch.
b. Open the bezel.
c. Detach the bezel from the latch ear.
Removal and replacement procedures
30
Summary of Contents for HPE ProLiant DL325
Page 24: ...Customer self repair 24 ...
Page 25: ...Customer self repair 25 ...
Page 26: ...Customer self repair 26 ...
Page 61: ... SFF a Remove the optical drive cage b Remove the blank Removal and replacement procedures 61 ...
Page 136: ... Slot 2 Slot 3 Cabling 136 ...
Page 139: ... Slot 2 Slot 3 Cabling 139 ...
Page 145: ... SFF Cable routing Power supply Non hot plug power supply Cabling 145 ...
Page 149: ...Cable routing Serial port Cabling 149 ...
Page 152: ... Slot 2 Slot 3 Cabling 152 ...