Removing the server from the rack
WARNING: This server is heavy. To reduce the risk of personal injury or damage to the equipment:
• Observe local occupational health and safety requirements and guidelines for manual material handling.
• Get help to lift and stabilize the product during installation or removal, especially when the product is not
fastened to the rails.
Hewlett Packard Enterprise recommends that a minimum of two people are required for all rack server
installations. If the server is installed higher than chest level, a third person may be required to help align the
server.
• Use caution when installing the server in or removing the server from the rack. The server is unstable when not
fastened to the rails.
Procedure
1. If installed, remove the bezel.
3. Extend the server from the rack.
4. Remove the server from the rack. Press and hold both server rail-release latches while removing the server.
5. Place the server on a sturdy, level surface.
Accessing the product rear panel
Procedure
1. Release the cable management arm.
Removal and replacement procedures
33
Summary of Contents for HPE ProLiant DL325
Page 24: ...Customer self repair 24 ...
Page 25: ...Customer self repair 25 ...
Page 26: ...Customer self repair 26 ...
Page 61: ... SFF a Remove the optical drive cage b Remove the blank Removal and replacement procedures 61 ...
Page 136: ... Slot 2 Slot 3 Cabling 136 ...
Page 139: ... Slot 2 Slot 3 Cabling 139 ...
Page 145: ... SFF Cable routing Power supply Non hot plug power supply Cabling 145 ...
Page 149: ...Cable routing Serial port Cabling 149 ...
Page 152: ... Slot 2 Slot 3 Cabling 152 ...