5.
Install all the components removed from the system board.
6.
Install the access panel.
7.
Install the server into the rack.
8.
Connect each power cord to the server.
9.
Connect each power cord to the power source.
10. Power up the server.
11. If removed, install the front bezel.
12. Ensure all firmware, including option cards and embedded devices, is updated to the same versions to ensure that
the latest drivers are being used.
13. Re-enter any Secure Boot Keys that were previously added in the Secure Boot configuration.
14. Re-enter the server serial number and the product ID.
Re-entering the server serial number and product ID
After you replace the system board, you must re-enter the server serial number and the product ID.
Procedure
1. During the server startup sequence, press the F9 key to access UEFI System Utilities.
2. Select System Configuration > BIOS/Platform Configuration (RBSU) > Advanced Options > Advanced System
ROM Options > Serial Number, and then press the Enter key.
3. Enter the serial number and press the Enter key.
The following message appears:
The serial number should only be modified by qualified service personnel.
This value should always match the serial number located on the chassis.
4. To clear the warning, press the Enter key.
5. Enter the serial number and press the Enter key.
Removal and replacement procedures
102
Summary of Contents for HPE ProLiant DL325
Page 24: ...Customer self repair 24 ...
Page 25: ...Customer self repair 25 ...
Page 26: ...Customer self repair 26 ...
Page 61: ... SFF a Remove the optical drive cage b Remove the blank Removal and replacement procedures 61 ...
Page 136: ... Slot 2 Slot 3 Cabling 136 ...
Page 139: ... Slot 2 Slot 3 Cabling 139 ...
Page 145: ... SFF Cable routing Power supply Non hot plug power supply Cabling 145 ...
Page 149: ...Cable routing Serial port Cabling 149 ...
Page 152: ... Slot 2 Slot 3 Cabling 152 ...