8.
If removed, connect the nonredundant power supply cable to system board.
To replace the component, reverse the removal procedure.
After the installation, the battery may take two hours to charge. The controller features that require
backup power are not re-enabled until the battery supports the backup power.
Removing and replacing the Smart Storage Battery holder
Procedure
.
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
•
Extend the server from the rack
.
•
Remove the server from the rack
6. Remove the Smart Storage Battery
7.
Remove the Smart Storage Battery holder.
60
Removal and replacement procedures
Summary of Contents for HPE ProLiant DL180 Gen10
Page 14: ...14 Customer self repair ...
Page 15: ...Customer self repair 15 ...
Page 16: ...16 Customer self repair ...
Page 17: ...Customer self repair 17 ...
Page 56: ... Secondary riser cage Slot 4 Slot 5 or 6 56 Removal and replacement procedures ...
Page 63: ... Secondary riser cage Slot 4 Slot 5 or 6 Removal and replacement procedures 63 ...
Page 124: ... 24 bay SFF hot plug drive model Fan bay numbering 124 Component identification ...
Page 130: ...Box 2 to type a controller Box 2 to type p controller 130 Cabling ...
Page 131: ...Box 3 to system board Box 3 to type a controller Cabling 131 ...
Page 132: ...Box 3 to type p controller 8 bay SFF power cable default 132 Cabling ...
Page 137: ...Mini SAS cable to SAS expander Cabling 137 ...
Page 139: ... M 2 SSD enablement board installed in secondary riser Cabling 139 ...
Page 144: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 144 Cabling ...
Page 146: ... Secondary riser cage Slot 4 Slot 5 or 6 146 Cabling ...