Removing the server from the rack
WARNING:
This server is heavy. To reduce the risk of personal injury or damage to the equipment:
• Observe local occupational health and safety requirements and guidelines for manual material
handling.
• Get help to lift and stabilize the product during installation or removal, especially when the
product is not fastened to the rails. Hewlett Packard Enterprise recommends that a minimum of
two people are required for all rack server installations. A third person may be required to help
align the server when the server is installed higher than chest level.
• Use caution when installing the server in or removing the server from the rack; it is unstable
when not fastened to the rails.
To remove the server from a Hewlett Packard Enterprise, Compaq-branded, Telco, or a third-party rack:
Procedure
.
2.
Remove all power.
a.
Disconnect all peripheral cables from the server.
b.
Disconnect each power cord from the server.
3. Extend the server from the rack
.
4.
Remove the server from the rack.
For instructions on how to extend or remove the server from the rack, see the documentation that
ships with the rack rail system.
5.
Place the server on a sturdy, level surface.
Removal and replacement procedures
31
Summary of Contents for HPE ProLiant DL180 Gen10
Page 14: ...14 Customer self repair ...
Page 15: ...Customer self repair 15 ...
Page 16: ...16 Customer self repair ...
Page 17: ...Customer self repair 17 ...
Page 56: ... Secondary riser cage Slot 4 Slot 5 or 6 56 Removal and replacement procedures ...
Page 63: ... Secondary riser cage Slot 4 Slot 5 or 6 Removal and replacement procedures 63 ...
Page 124: ... 24 bay SFF hot plug drive model Fan bay numbering 124 Component identification ...
Page 130: ...Box 2 to type a controller Box 2 to type p controller 130 Cabling ...
Page 131: ...Box 3 to system board Box 3 to type a controller Cabling 131 ...
Page 132: ...Box 3 to type p controller 8 bay SFF power cable default 132 Cabling ...
Page 137: ...Mini SAS cable to SAS expander Cabling 137 ...
Page 139: ... M 2 SSD enablement board installed in secondary riser Cabling 139 ...
Page 144: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 144 Cabling ...
Page 146: ... Secondary riser cage Slot 4 Slot 5 or 6 146 Cabling ...